(800) 710-4253

 

Danaher Dynapar Eagle Signal Veeder Root

 

(317) 535-3733

100 Crossroads Dr, Suite C, New Whiteland, IN 46184

Select the letter or number your part number begins with from the list below. Some lists may be long, so please wait for the page to load fully. Some part numbers have had the number 0 added to the first of the part number. If you are unable to find your part number, this could mean your unit has been obsoleted or it could just mean your part will needs to be quoted, call us at (800) 710-4253 and we will try to assist you.

0 • 1 • 2 • 3 • 4 • 6 • 7 • 8 • 9 • A • B • C • D • F • H • L • M • P • R • S • T • V • Z

Price List

To view the attachment, you must have the Adobe® Reader® software installed on your computer. To get a free version of this software from Adobe, click here:

Part Number Lead Time Description Spec Manual Photo
42700681 14-21 Days** Relay socket Spec Manual Photo
42M1CA024 14-21 Days** Power relay; 24VAC; One pole Spec Manual Photo
42M1CA120 14-21 Days** Power relay; 120VAC; One pole Spec Manual Photo
42M1CA240 14-21 Days** Power relay; 240VAC; One pole Spec Manual Photo
42M1XA120 14-21 Days** Power relay; 120VAC; One pole Spec Manual Photo
42M2AA024 14-21 Days** Power relay; 24VAC; Two pole Spec Manual Photo
42M2AA120 14-21 Days** Power relay; 120VAC; Two pole Spec Manual Photo
42M2CA024 14-21 Days** Power relay; 24VAC; Two pole Spec Manual Photo
42M2CA120 14-21 Days** Power relay; 120VAC; Two pole Spec Manual Photo
42M2CA240 14-21 Days** Power relay; 240VAC; Two pole Spec Manual Photo
42M2CD024 14-21 Days** Power relay; 24VDC; Two pole Spec Manual Photo
42M2CD110 14-21 Days** Power relay; 110VDC; Two pole Spec Manual Photo
CF = Call for lead time    

**Lead times are factory estament. Actual lead time may vary. Some items maybe available for immediate shipment.

 

Home | Product | Search | Services | Specials | Terms | About us | Contact | Order Form | Linked Sights

Last updated on Wednesday, 02. January 2008 by Michael A. Gale President

Hit Counter